Saturday 31 January 2009

New bathroom

I think I mentioned that we were planning to put a new bath upstairs. 

When it came to it, it seemed like a good idea to replace the toilet and wash basin as well.

This meant that part of a pine-panelled wall would have to be replaced because of a different location of the toilet cistern.

Then we had a good look at the floor, and thought that if we were doing all this work, we might as well retile the floor, which had a couple of cracked tiles.

So now that I have put up a new light fitting and replaced the inadquate heating, we are nearly ready to replace the bath......

No comments: